1.       

Consultancy Services for Preparation of detailed Engineering for the EPC Project "Two lane with Paved Shoulders of Kalwakurthi (NH-765 Junction Start) to Mallepally Section from KM67.000 to KM 114.205 in the State of Telangana.

JRC-KCVR Projects/ Ministry of Road Transport & Highways (MoRTH)

India

Rehabilitation and up -gradation of 47 Km road with bituminous pavement overlay, toll plaza with rigid pavement, 11 bridges over 50 culverts.    

April 2017-Date

Detailed engineering design including, inventory & condition survey, topographical surveys, soil & material investigation design of road geometrics, pavement & overlay design, bridge and structural design, storm water drainage design.

2.       

Proof Checking Consultant  for Rehabilitation and up-gradation of NH-78 from Km 468.600 to Km 531.250 (Pathalgaon to Kunkuri Section) in the state of Chhattisgarh to two-lanes with paved shoulders under NHDP-IV through (EPC) basis.

P.W.D. Raipur, Chhattisgarh

India

Rehabilitation and up- gradation of 62.6 Km road section with 3 major and 12 minor bridges, 100 culverts.  Rigid pavement construction..   

Feb 2017-Ongoing

Proof checking of design and drawings as per provision of EPC contract technical schedules, IRC standards, guidelines.  

3.       

Proof Checking Consultant for Rehabilitation and up-gradation of NH-78 from Km 373.505 to Km 469.300 (Ambikapur to Pathalgaon Section) in the state of Chhattisgarh to two-lanes with paved shoulders under NHDP-IV through (EPC) basis.

P.W.D. Raipur, Chhattisgarh

India

Rehabilitation and up- gradation of 96.8 Km road. 5 major bridges, 16 minor bridges, RoB, 180 culverts.  Rigid pavement construction for 70 Km length.

Feb 2017-Ongoing

Proof checking of design and drawings as per provision of EPC contract technical schedules, IRC standards, guidelines.  

4.       

Detailed Project Report for forming 6-Lane Ring Road along with link roads (7.5 Km) around Yadadri Temple along with New Ghat Road (1 Km)

Government of Telangana, Roads & Building Department

India

6-Lane Ring Road around Yadadri Temple and link roads.

Dec 2016-March 2017

Detailed Project Report (DPR) including filed surveys, design and drawings detailed cost-estimates

5.       

Consultancy Services for preparation of Detailed Project Report (DPR) for Improvement of Single Lane and Double Lane Roads of R&B Roads Division, Hyderabad in Rangareddy District of Telangana State – Package-I (R&B Vikara-bad Division)

Government of Telangana, Roads & Building Department

India

Detailed design of 94.8 Km two lane roads in Rajareddy district of Telangana State.

2015-2016

Detailed Project Report (DPR) including filed surveys, design and drawings detailed cost-estimates

6.       

Safety Consultants for Operation & Maintenance of Palanpur-Radhanpur-Samkhiyali section of New NH-27 from Km 340 to Km 601 on OMT basis in the State of Gujarat

NHAI

India

259 Km four lane project

2014 Ongoing

Design Review, Safety Audit of highway, preparation of check lists, Gap reports and Safety Audit reports

7.       

Road Safety Consultants for 2-lanning with paved shoulders of Raebareilly-Allahabad Section of NH-24B (106 Km)

NHAI

India

106 Km long 2-lanning project with 3-bypasses, 1- ROB

2014-Ongoing

Design Review, Safety Audit of highway, preparation of check lists, Gap reports and Safety Audit reports

8.       

Multi-sector Project for Infrastructure Rehabilitation in J&K (ADB Loan No. 2151-Ind)

URS Scott Wilson/J&K Economic Reconstruction Agency

India

Improvement of Urban and Road Transport Infrastructure in J&K

2011-2013

Study on sustainability of roads and bridges, possible establishment of a road fund for operation and management (O&M) of transportation assets of J&K State and provide assistance in setting up RMS (Road Management System in J&K)

9.       

Feasibility Study of Multi-Modal Corridor (MMC) from Virar to Aulibag,

LBG Inc/ Mumbai Metropolitan Regional Development Authority (MMRDA)

India

Feasibility study for 165 Km of MMC with   railway metro, BRTS, motorized and non motorized traffic lanes

2010-11

Geometric design, cost-estimation, feasibility study

10.    

Consultancy Services for Preparation of Feasibility study for 6/4/2 lane with paved shoulder of Bhavnagar-Pipavav- Porbandar-Dwarka section of NH-8E in the State of Gujarat (approx length 445 km)

Stup Consultants Pvt. Ltd/National Highways Authority of India

India

It is a upgrading / capacity augmentation of existing 2-lane road to six/four/two-Lane with paved shoulder corridors considering the traffic demand and safety aspects. Proposed solutions to be feasible, constructible and manageable.

2010-11

Provided Services of Team Leader responsible for planning of activities, coordination, of engineering surveys & investigation and study result of the Feasibility Study.

11.    

Design Review of RSAP II Road

The World Bank

Sri Lanka

Review of Highway Design of Ambepussa-Dambulla and Kantale-Trincomalee road under World Bank Road Sector Assistance

2010-11

Review of highway design and drawings carried out by Sri Lanka Road Development Authority

12.    

Consultancy Services for Traffic Estimation of Zirakpur-Parwanoo Project

Himalayan Expressway Limited (Jaypee Group)

India

Estimation of future Traffic Projections & toll revenue estimation for project road section of NH-22 on BOT (NHDP Phase III) through Punjab, Haryana and Himachal Pradesh State.

2011

Traffic Volume counts, Origin & Destination Survey, Willingness to Pay survey estimation of future diverted and generated traffic, future toll collection revenue

13.    

Short Term Traffic & Transportation Engineering Measures for Luck now & Kanpur

Urban Mass Transit Company Ltd. (JV of MoUD Govt. of India, Govt. of AP, APSRTC, and IL&FS)

India

Junction improvement, road safety and traffic management measures.

2011

Design of Junction layouts, provision of road furniture, safety measures, cost-estimation (BoQ)

14.    

Pre-Tender Consultancy Services for Tindivanam-Krishnagiri Section of NH-66

KNR Constructions Ltd.

India

Two Laning of 182 Km road section of NH-66 under NHDP phase III in Tamilnadu State

2011

Preliminary engineering, preparation of Bill of Quantities and Cost estimation

15.    

Road Design & Drainage Design for BRTS Corridor at Indore

Neeraj-Pratibha JV

India

11.5 km of Urban Road section having physical separated multiple lanes - bus lane, motor vehicle lanes, cycle track, footpath and service roads

2008-09

Road Design, Mapping of utility services, preparation of vertical profile, cross-sections, drainage design for multiple lanes of BRTS work

16.    

Detailed Design and Preparation of Bid Document for Construction of Rajkot Pilot BRTS Corridor

SG Architects/UMTC

India

10.7 km of Urban Road section having physical separated multiple lanes - bus lane, motor vehicle lanes, cycle track, footpath and service roads

2007-2010

Preparation of Bid Documents, Alignment design, design modification during construction

17.    

BRTS Jaipur

CES(I) Pvt Ltd/PDCOR

India

40 Km of Urban roads

2007-2008

Alignment design geometrics, Bill of Quantities

18.    

BRTS Delhi pilot corridor from- Ambedkar-Nagar to Delhi Gate

B. Sinnaiah & C&C Ltd.

India

Construction of Central Bus lane for Plying of High Capacity Bus Systems being introduced in Delhi

2006-2008

Detailed Design of Road Alignment, Profile etc. Working out elevations on Architectural layout drawings.

19.    

6-Laning of Chennai-Tada Section of NH-5

SNC-AARVEE JV/NHAI

India

Widening (6 Laning) of 44 Km section of NH-5 (Chennai-Tada Section) under construction through DBFO contract

2009-2010

Review of highway design and drawing from DBFO Concessionaire

20.    

Design of Old Mughal Road

Hindustan Construction Company

India

80 Km of 2 lane road in Mountainous terrain of J&K State Joining Poonch to Srinagar Valley

2008-2011

Detail design and design solutions during construction

21.    

Institutional Strengthening and Capacity Building of Chhattisgarh State Road Sector

Louis Berger Group Inc.

India

Asian Development Bank (ADB) Technical Assistance Project

2008-2009

Providing services of Highway design engineer, Road Safety –Audit, Providing training to PWD staff on road maintenance

22.    

Pre-Tender Engineering Consultancy Services for Patahnkot -Amritsar Section of NH-15

Oriental Structural Engineers Pvt. Ltd.

India

Review of feasibility study report, available design & drawings.

Assessment of realistic designs based on available data and preparation of BOQ for tender purpose meeting requirements of RFP

2008-2009

Providing assistance to client in the bidding process

23.    

Pre-Tender Engineering Consultancy Services for Haryana State Roads

Oriental Structural Engineers Pvt. Ltd.

India

Review of feasibility study report, available design & drawings.

Assessment of realistic designs based on available data and preparation of BOQ for tender purpose meeting requirements of RFP

2008

Providing assistance to client in the bidding process

24.    

Traffic Estimation on Taj-Expressway and Eastern Peripheral Highway

Jai Prakash Associates Limited

India

Estimation of future Traffic Projections for next 40 years on the proposed expressways in the NCR

2007-2008

Traffic Volume counts, Origin & Destination Survey, Willingness to Pay survey estimation of future diverted and generated traffic, future toll collection revenue.

25.    

Extension of Taj-Expressway Project

Jai-Prakash Associates Limited

India

Detailed design of proposed extension of Taj-Expessway from NH-2 Junction to Fatehabad Road (13 Km) including Layout and General Arrangement Drawings of Clovrleaf Interchange, Trumpet Interchange and Bridge over Yamuna river

2006 –  2007

Detailed Design & drawing, Estimation of quantities & costs.

26.    

Proof Checking of Western Peripheral Expressway (KMP Expressway)

D.S. Constructions Limited

India

Review/proof checking of road design and drawing carried out by design consultants for KMP Expressway (Delhi’s Western Peripheral Expressway) in Haryana

2007-2008

Detailed review of alignment design and interchange layout, optimizing alignment design in small section in hilly terrain

27.    

Chittagong Port Trade Facilitation Project-Connector Road

SMEC Bangladesh

Bangladesh

Detailed Design of 1.4 Km of road having 1km of via-duct over passing Railway line, Saltgola Junction and bridge over Mohesh Khal River through Chittagong urban area

2006- 2007

Detailed Design & drawing,

28.    

Conceptual Layout of Ring Road Bypass on Mughal Bundh Road in Delhi

Delhi PWD

India

Construction of new road   through left bank (Mughal Bundh) of Yamuna River has been proposed on ring road to bypass Rajaghat Area

2007

Detailed Layout & drawing,

29.    

Transport Sector Evaluation Study for India

Asian Development Bank (ADB)

India

Technical Evaluation of ADB’s assistance in Transport Sector in India

May-August 2006

Study of Indian Transport Sector identifying Technical issues

30.    

Design of approach road to Sri Sailam Left Bank Canal Tunnel Scheme

Jai Prakash Associates Limted

India

Design of approach road to proposed tunnel on left Bank of Krishna River at Srisailam in A.P.

2006

Detailed Design & drawing, Estimation of quantities.

31.    

Old Mughal Road

Construma Consultancy Services

India

80 Km of 2 lane road in Mountainous terrain of J&K State Joining Poonch to Srinagar Valley

2005-2008

Detail design and design solutions during construction

32.    

Rajasthan Mega Highway Project

MSV International Inc.

India

Design of 138 Km of Rajasthan State Highway in Barmer District (Pachpadra to Ramji ki Gol)

2006-2007

Detail design and design solutions during construction

33.    

Delhi Gurgaon Expressway

JAYPEE-DSC Ventures Ltd.

India

28 km of 8/6 lane dual carriageway road on BOT including 11 flyovers and 2 underpasses

2002 –2006

Detail design and design solutions during construction

34.    

Four Laning of NH-57 from Muzzafarpur to Darbhanga

Mahindra Raj Consultants Pvt. Ltd.

India

DPR for aprox 60 km of road in the flood plains in Bihar state

2004-2005

Detailed design and drawing

35.    

Raipur Durg Section of NH6

D S Constructions Ltd.

India

Construction of approximately 26 km four lane highway with one river crossing , one canal crossing and one ROB. BOT Project

2003- 2005

Detail design and design solutions during construction

36.    

Delhi-Metro Rail

Project-Restoration of road in package MC-1

L&T Ramboll Ltd.

India

Restoration of Road work for cut & cover section of Delhi-Metro works by IMCC.

2005

Design for road restoration work

37.    

Kochin Port Connectivity Project

Dalal-Mott Macdonald Ltd.

India

Construction supervision for 10 Km of NH-47 with bridges (5 nos) on backwaters of Arabian Sea.

2004-2006

Highway Design Engineer in construction supervision

38.    

Pedestrian Subway at Govindgarh

Central Road Research Institute (CRRI)

India

Detailed Project Report and Tender documents for the construction of subway at Bank of India/Bus Station crossing in Govindgarh (NH-1) in Punjab State

2004

Detail structural design,    architectural finish, lighting and bid documents

39.    

Approach to Dwarka Dwar ROB

L&T Ramboll Ltd.

India

Design of 4 lane approach to Dwarka Dwar ROB including underpass near Palam Airport in New Delhi

2003- 2004

Detail design

40.    

Ranchi ring Road

MSV International Inc.

India

60 km of 6 lane dual carriageway road

2003-2004

Detail design

41.    

West Bengal Corridor Development

Louis Berger Group

India

100  km of 2 lane road

2002-2003

Tender Documents and Drawings

42.    

Kandhar-Spinboldak Road in Afghanistan

MSV-LRP JV.

Afghanistan

103 km of 2 lane road

2003-2004

Detail design

43.    

Pule-e-Khumuri to Sherkhan-Bandar

Louis Berger Group

Afghanistan

60 km of 2 lane road

2003

Tender Documents and Drawings

44.    

Kabul -Kandhar- Road in Afghanistan

MSV-LRP JV.

Afghanistan

80 km of 2 lane road

2003-2004

Detail design

 

 

 

 

 

 

Sl. No

Project Name

Client

Country

Features

Years of Services

Nature of Services

1.       

Consultancy Services for Preparation of detailed Engineering for the EPC Project "Two lane with Paved Shoulders of Kalwakurthi (NH-765 Junction Start) to Mallepally Section from KM67.000 to KM 114.205 in the State of Telangana.

JRC-KCVR Projects/ Ministry of Road Transport & Highways (MoRTH)

India

Rehabilitation and up -gradation of 47 Km road with bituminous pavement overlay, toll plaza with rigid pavement, 11 bridges over 50 culverts.    

April 2017-Date

Detailed engineering design including, inventory & condition survey, topographical surveys, soil & material investigation design of road geometrics, pavement & overlay design, bridge and structural design, storm water drainage design.

2.       

Proof Checking Consultant  for Rehabilitation and up-gradation of NH-78 from Km 468.600 to Km 531.250 (Pathalgaon to Kunkuri Section) in the state of Chhattisgarh to two-lanes with paved shoulders under NHDP-IV through (EPC) basis.

P.W.D. Raipur, Chhattisgarh

India

Rehabilitation and up- gradation of 62.6 Km road section with 3 major and 12 minor bridges, 100 culverts.  Rigid pavement construction..   

Feb 2017-Ongoing

Proof checking of design and drawings as per provision of EPC contract technical schedules, IRC standards, guidelines.  

3.       

Proof Checking Consultant for Rehabilitation and up-gradation of NH-78 from Km 373.505 to Km 469.300 (Ambikapur to Pathalgaon Section) in the state of Chhattisgarh to two-lanes with paved shoulders under NHDP-IV through (EPC) basis.

P.W.D. Raipur, Chhattisgarh

India

Rehabilitation and up- gradation of 96.8 Km road. 5 major bridges, 16 minor bridges, RoB, 180 culverts.  Rigid pavement construction for 70 Km length.

Feb 2017-Ongoing

Proof checking of design and drawings as per provision of EPC contract technical schedules, IRC standards, guidelines.  

4.       

Detailed Project Report for forming 6-Lane Ring Road along with link roads (7.5 Km) around Yadadri Temple along with New Ghat Road (1 Km)

Government of Telangana, Roads & Building Department

India

6-Lane Ring Road around Yadadri Temple and link roads.

Dec 2016-March 2017

Detailed Project Report (DPR) including filed surveys, design and drawings detailed cost-estimates

5.       

Consultancy Services for preparation of Detailed Project Report (DPR) for Improvement of Single Lane and Double Lane Roads of R&B Roads Division, Hyderabad in Rangareddy District of Telangana State – Package-I (R&B Vikara-bad Division)

Government of Telangana, Roads & Building Department

India

Detailed design of 94.8 Km two lane roads in Rajareddy district of Telangana State.

2015-2016

Detailed Project Report (DPR) including filed surveys, design and drawings detailed cost-estimates

6.       

Safety Consultants for Operation & Maintenance of Palanpur-Radhanpur-Samkhiyali section of New NH-27 from Km 340 to Km 601 on OMT basis in the State of Gujarat

NHAI

India

259 Km four lane project

2014 Ongoing

Design Review, Safety Audit of highway, preparation of check lists, Gap reports and Safety Audit reports

7.       

Road Safety Consultants for 2-lanning with paved shoulders of Raebareilly-Allahabad Section of NH-24B (106 Km)

NHAI

India

106 Km long 2-lanning project with 3-bypasses, 1- ROB

2014-Ongoing

Design Review, Safety Audit of highway, preparation of check lists, Gap reports and Safety Audit reports

8.       

Multi-sector Project for Infrastructure Rehabilitation in J&K (ADB Loan No. 2151-Ind)

URS Scott Wilson/J&K Economic Reconstruction Agency

India

Improvement of Urban and Road Transport Infrastructure in J&K

2011-2013

Study on sustainability of roads and bridges, possible establishment of a road fund for operation and management (O&M) of transportation assets of J&K State and provide assistance in setting up RMS (Road Management System in J&K)

9.       

Feasibility Study of Multi-Modal Corridor (MMC) from Virar to Aulibag,

LBG Inc/ Mumbai Metropolitan Regional Development Authority (MMRDA)

India

Feasibility study for 165 Km of MMC with   railway metro, BRTS, motorized and non motorized traffic lanes

2010-11

Geometric design, cost-estimation, feasibility study

10.    

Consultancy Services for Preparation of Feasibility study for 6/4/2 lane with paved shoulder of Bhavnagar-Pipavav- Porbandar-Dwarka section of NH-8E in the State of Gujarat (approx length 445 km)

Stup Consultants Pvt. Ltd/National Highways Authority of India

India

It is a upgrading / capacity augmentation of existing 2-lane road to six/four/two-Lane with paved shoulder corridors considering the traffic demand and safety aspects. Proposed solutions to be feasible, constructible and manageable.

2010-11

Provided Services of Team Leader responsible for planning of activities, coordination, of engineering surveys & investigation and study result of the Feasibility Study.

11.    

Design Review of RSAP II Road

The World Bank

Sri Lanka

Review of Highway Design of Ambepussa-Dambulla and Kantale-Trincomalee road under World Bank Road Sector Assistance

2010-11

Review of highway design and drawings carried out by Sri Lanka Road Development Authority

12.    

Consultancy Services for Traffic Estimation of Zirakpur-Parwanoo Project

Himalayan Expressway Limited (Jaypee Group)

India

Estimation of future Traffic Projections & toll revenue estimation for project road section of NH-22 on BOT (NHDP Phase III) through Punjab, Haryana and Himachal Pradesh State.

2011

Traffic Volume counts, Origin & Destination Survey, Willingness to Pay survey estimation of future diverted and generated traffic, future toll collection revenue

13.    

Short Term Traffic & Transportation Engineering Measures for Luck now & Kanpur

Urban Mass Transit Company Ltd. (JV of MoUD Govt. of India, Govt. of AP, APSRTC, and IL&FS)

India

Junction improvement, road safety and traffic management measures.

2011

Design of Junction layouts, provision of road furniture, safety measures, cost-estimation (BoQ)

14.    

Pre-Tender Consultancy Services for Tindivanam-Krishnagiri Section of NH-66

KNR Constructions Ltd.

India

Two Laning of 182 Km road section of NH-66 under NHDP phase III in Tamilnadu State

2011

Preliminary engineering, preparation of Bill of Quantities and Cost estimation

15.    

Road Design & Drainage Design for BRTS Corridor at Indore

Neeraj-Pratibha JV

India

11.5 km of Urban Road section having physical separated multiple lanes - bus lane, motor vehicle lanes, cycle track, footpath and service roads

2008-09

Road Design, Mapping of utility services, preparation of vertical profile, cross-sections, drainage design for multiple lanes of BRTS work

16.    

Detailed Design and Preparation of Bid Document for Construction of Rajkot Pilot BRTS Corridor

SG Architects/UMTC

India

10.7 km of Urban Road section having physical separated multiple lanes - bus lane, motor vehicle lanes, cycle track, footpath and service roads

2007-2010

Preparation of Bid Documents, Alignment design, design modification during construction

17.    

BRTS Jaipur

CES(I) Pvt Ltd/PDCOR

India

40 Km of Urban roads

2007-2008

Alignment design geometrics, Bill of Quantities

18.    

BRTS Delhi pilot corridor from- Ambedkar-Nagar to Delhi Gate

B. Sinnaiah & C&C Ltd.

India

Construction of Central Bus lane for Plying of High Capacity Bus Systems being introduced in Delhi

2006-2008

Detailed Design of Road Alignment, Profile etc. Working out elevations on Architectural layout drawings.

19.    

6-Laning of Chennai-Tada Section of NH-5

SNC-AARVEE JV/NHAI

India

Widening (6 Laning) of 44 Km section of NH-5 (Chennai-Tada Section) under construction through DBFO contract

2009-2010

Review of highway design and drawing from DBFO Concessionaire

20.    

Design of Old Mughal Road

Hindustan Construction Company

India

80 Km of 2 lane road in Mountainous terrain of J&K State Joining Poonch to Srinagar Valley

2008-2011

Detail design and design solutions during construction

21.    

Institutional Strengthening and Capacity Building of Chhattisgarh State Road Sector

Louis Berger Group Inc.

India

Asian Development Bank (ADB) Technical Assistance Project

2008-2009

Providing services of Highway design engineer, Road Safety –Audit, Providing training to PWD staff on road maintenance

22.    

Pre-Tender Engineering Consultancy Services for Patahnkot -Amritsar Section of NH-15

Oriental Structural Engineers Pvt. Ltd.

India

Review of feasibility study report, available design & drawings.

Assessment of realistic designs based on available data and preparation of BOQ for tender purpose meeting requirements of RFP

2008-2009

Providing assistance to client in the bidding process

23.    

Pre-Tender Engineering Consultancy Services for Haryana State Roads

Oriental Structural Engineers Pvt. Ltd.

India

Review of feasibility study report, available design & drawings.

Assessment of realistic designs based on available data and preparation of BOQ for tender purpose meeting requirements of RFP

2008

Providing assistance to client in the bidding process

24.    

Traffic Estimation on Taj-Expressway and Eastern Peripheral Highway

Jai Prakash Associates Limited

India

Estimation of future Traffic Projections for next 40 years on the proposed expressways in the NCR

2007-2008

Traffic Volume counts, Origin & Destination Survey, Willingness to Pay survey estimation of future diverted and generated traffic, future toll collection revenue.

25.    

Extension of Taj-Expressway Project

Jai-Prakash Associates Limited

India

Detailed design of proposed extension of Taj-Expessway from NH-2 Junction to Fatehabad Road (13 Km) including Layout and General Arrangement Drawings of Clovrleaf Interchange, Trumpet Interchange and Bridge over Yamuna river

2006 –  2007

Detailed Design & drawing, Estimation of quantities & costs.

26.    

Proof Checking of Western Peripheral Expressway (KMP Expressway)

D.S. Constructions Limited

India

Review/proof checking of road design and drawing carried out by design consultants for KMP Expressway (Delhi’s Western Peripheral Expressway) in Haryana

2007-2008

Detailed review of alignment design and interchange layout, optimizing alignment design in small section in hilly terrain

27.    

Chittagong Port Trade Facilitation Project-Connector Road

SMEC Bangladesh

Bangladesh

Detailed Design of 1.4 Km of road having 1km of via-duct over passing Railway line, Saltgola Junction and bridge over Mohesh Khal River through Chittagong urban area

2006- 2007

Detailed Design & drawing,

28.    

Conceptual Layout of Ring Road Bypass on Mughal Bundh Road in Delhi

Delhi PWD

India

Construction of new road   through left bank (Mughal Bundh) of Yamuna River has been proposed on ring road to bypass Rajaghat Area

2007

Detailed Layout & drawing,

29.    

Transport Sector Evaluation Study for India

Asian Development Bank (ADB)

India

Technical Evaluation of ADB’s assistance in Transport Sector in India

May-August 2006

Study of Indian Transport Sector identifying Technical issues

30.    

Design of approach road to Sri Sailam Left Bank Canal Tunnel Scheme

Jai Prakash Associates Limted

India

Design of approach road to proposed tunnel on left Bank of Krishna River at Srisailam in A.P.

2006

Detailed Design & drawing, Estimation of quantities.

31.    

Old Mughal Road

Construma Consultancy Services

India

80 Km of 2 lane road in Mountainous terrain of J&K State Joining Poonch to Srinagar Valley

2005-2008

Detail design and design solutions during construction

32.    

Rajasthan Mega Highway Project

MSV International Inc.

India

Design of 138 Km of Rajasthan State Highway in Barmer District (Pachpadra to Ramji ki Gol)

2006-2007

Detail design and design solutions during construction

33.    

Delhi Gurgaon Expressway

JAYPEE-DSC Ventures Ltd.

India

28 km of 8/6 lane dual carriageway road on BOT including 11 flyovers and 2 underpasses

2002 –2006

Detail design and design solutions during construction

34.    

Four Laning of NH-57 from Muzzafarpur to Darbhanga

Mahindra Raj Consultants Pvt. Ltd.

India

DPR for aprox 60 km of road in the flood plains in Bihar state

2004-2005

Detailed design and drawing

35.    

Raipur Durg Section of NH6

D S Constructions Ltd.

India

Construction of approximately 26 km four lane highway with one river crossing , one canal crossing and one ROB. BOT Project

2003- 2005

Detail design and design solutions during construction

36.    

Delhi-Metro Rail

Project-Restoration of road in package MC-1

L&T Ramboll Ltd.

India

Restoration of Road work for cut & cover section of Delhi-Metro works by IMCC.

2005

Design for road restoration work

37.    

Kochin Port Connectivity Project

Dalal-Mott Macdonald Ltd.

India

Construction supervision for 10 Km of NH-47 with bridges (5 nos) on backwaters of Arabian Sea.

2004-2006

Highway Design Engineer in construction supervision

38.    

Pedestrian Subway at Govindgarh

Central Road Research Institute (CRRI)

India

Detailed Project Report and Tender documents for the construction of subway at Bank of India/Bus Station crossing in Govindgarh (NH-1) in Punjab State

2004

Detail structural design,    architectural finish, lighting and bid documents

39.    

Approach to Dwarka Dwar ROB

L&T Ramboll Ltd.

India

Design of 4 lane approach to Dwarka Dwar ROB including underpass near Palam Airport in New Delhi

2003- 2004

Detail design

40.    

Ranchi ring Road

MSV International Inc.

India

60 km of 6 lane dual carriageway road

2003-2004

Detail design

41.    

West Bengal Corridor Development

Louis Berger Group

India

100  km of 2 lane road

2002-2003

Tender Documents and Drawings

42.    

Kandhar-Spinboldak Road in Afghanistan

MSV-LRP JV.

Afghanistan

103 km of 2 lane road

2003-2004

Detail design

43.    

Pule-e-Khumuri to Sherkhan-Bandar

Louis Berger Group

Afghanistan

60 km of 2 lane road

2003

Tender Documents and Drawings

44.    

Kabul -Kandhar- Road in Afghanistan

MSV-LRP JV.

Afghanistan

80 km of 2 lane road

2003-2004

Detail design